October 9, 2026
Commercial - Plumbing · BP-202604138 · PENDING
Emory University Hospital Midtown Cath Lab 1 Renovation -- Renovation of Cath Lab 1, installation of 2 new wall outlets
October 9, 2026
Commercial - HVAC · BM-202605038 · PENDING
Emory University Hospital Midtown Chiller Plant Expansion -- Installment of mechanical piping, (1) Chiller, (1) Cooling tower, (2) pumps.
October 9, 2026
Commercial - HVAC · BM-202605034 · PENDING
Emory University Hospital Midtown Cath Lab 1 Renovation -- Renovation of Cath Lab 1, installation of new ductwork above, installation of 6 new diffusers.
October 6, 2026
Commercial Alteration · BB-202608710 · PENDING
EUHM - 17th Floor Specialty Pharmacy Renovation PHASE 3 (LC) (CC) -- PHASE 3 (of 3): Interior renovation of an existing occupied pharmacy space Suite 1720 on the 17th floor of the Emory University Hospital Midtown medical office tower. Phase 2 work will include finishing of remaining packaging a...
Cost of construction: $70,734
October 6, 2026
Commercial Alteration · BB-202608709 · PENDING
EUHM - 17th Floor Specialty Pharmacy Renovation PHASE 2 (LC) -- PHASE 2 (of 3): Interior renovation of an existing occupied pharmacy space on the 17th floor of the Emory University Hospital Midtown medical office tower. Phase 2 work will include demolition in the packaging area, additional elect...
Cost of construction: $157,453
October 6, 2026
Commercial Alteration · BB-202608708 · PENDING
EUHM - 17th Floor Specialty Pharmacy Renovation PHASE 1 (LC) (CC) -- PHASE 1 (of 3): Interior renovation of an existing occupied pharmacy on the 17th floor of the Emory University Hospital Midtown medical office tower. Phase 1 work will include a new door, electrical cabling and fixtures for new...
Cost of construction: $81,714
October 2, 2026
Commercial - Electrical · BE-202606944 · ISSUED
BB-202601321 -- Cath machine electrical installation
October 1, 2026
Commercial - Plumbing · 26TMP-064834 · OTHER
Emory University Hospital Midtown Cath Lab 1 Renovation -- Renovation of Cath Lab 1, installation of 2 new wall outlets
October 1, 2026
Commercial - HVAC · 26TMP-064828 · OTHER
Emory University Hospital Midtown Cath Lab 1 Renovation -- Renovation of Cath Lab 1, installation of new ductwork above, installation of 6 new diffusers.
October 1, 2026
Commercial - HVAC · 26TMP-064820 · OTHER
Emory University Hospital Midtown Chiller Plant Expansion -- Installment of mechanical piping, (1) Chiller, (1) Cooling tower, (2) pumps.
September 21, 2026
Commercial - Fire Sprinkler · BP-202603817 · PENDING
EUHM ED EXPANSION & EMPATH UNIT -- ADVANTAGE FIRE IS TO ADD/RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM IN ACCORDANCE TO NFPA 13 2022.
September 10, 2026
Commercial - Low Voltage · BE-202606384 · ISSUED
HEWATT EMORY ED EXPANSION -- FIRE ALARM
September 1, 2026
Commercial - Plumbing · BP-202603536 · PENDING
BB-202601889 -- remove sink for new millwork, put sink back in place
August 27, 2026
Commercial - Electrical · BE-202606032 · ISSUED
Emory University Hospital Midtown - Heart & Vascular Relocation Suite 1400 -- Interior renovation of a vacant second generation tenant space on the 14
floor at Emory University Hospital Midtown Medical Office Tower for a new combined medical office suite
August 24, 2026
Commercial Alteration · BB-202607399 · PENDING
Emory University Hospital Midtown - Heart & Vascular Relocation Suite 1400 -- Interior renovation of a vacant second generation tenant space on the 14
floor at Emory University Hospital Midtown Medical Office Tower for a new combined medical office suite.
Cost of construction: $2,150,467
August 21, 2026
Commercial - Plumbing · BP-202603338 · ISSUED
Emory University Hospital Midtown-Diagnostic and Therapeutic X-Ray Renov -- Remove an existing sink from millwork,and replace with a new sink in the same location using all the same supply and rough in for the drainage.
August 18, 2026
Commercial - Plumbing · BP-202603277 · ISSUED
MOT 14 -- install fixtures into existing plumbing
August 18, 2026
Commercial - HVAC · BM-202603932 · ISSUED
Emory University Hospital Heart and Vascular - 14th Floor -- Demo existing ductwork & grilles as shown
• Demo existing Boxes as required and return to the Building
• Furnish and install (8) new PIU’s with Siemens controls
• Furnish and Install (1) Chilled water fan coil unit for The Data Closet
•...
August 18, 2026
Commercial - Low Voltage · BE-202605704 · ISSUED
EMORY UNIVERSITY HOSPITAL MIDTOWN - HEART & VASCULAR RELOCATION -- FIRE ALARM
August 18, 2026
Commercial Alteration · BB-202607236 · PENDING
Emory Univeristy Hospital Midotwn - Heart & Vascular Relocation Suite 1400 -- Interior renovation of a vacant second generation tenant space on the 14th floor at Emory University Hospital Midtown Medical Office Tower for a new combined medical office suite - electrical scope.
Cost of construction: $350,000
August 3, 2026
Commercial - Electrical · BE-202605336 · ISSUED
550 Peachtree St. D&T Bldg. -- Installation of electrical circuits for equipment
July 29, 2026
Commercial - Fire Sprinkler · BP-202602996 · PENDING
EUHM MOT 14 HEART & VASCULAR RELOCATION (SUITE #1400) -- CENTURY TO ADD AND RELOCATE OFF THE EXISTING FIRE SPRINKLER SYSTEM PER NFPA 13.
July 22, 2026
Commercial Alteration · BB-202606380 · PENDING
Emory University Hospital Midtown Chiller Plant COM (CC) -- New screen wall and cooling tower. Screen wall panels to match existing panels.
Cost of construction: $3,390,000
July 22, 2026
Commercial - Plumbing · 26TMP-047868 · OTHER
July 22, 2026
Commercial Alteration · 26TMP-036160 · OTHER
Emory Midtown Hospital Cafeteria Renovation (LC) -- Remove wall hung sinks, install new water supplies for coffee and soda dispensers, installation of floor sink, reconnection of existing wall mounted sinks.