August 27, 2026
Commercial Express · BB-202607536 · PENDING
OTC- VENTURELLC- ALTERATION BLDG C (XPRS) -- COMMERICAL BUILDING C
REPLACE 27 WINDOWS INKIND, ALL WORK TO OCCUR WITHIN THE EXISTING WINDOW OPENINGS.
NO STRUCTURAL CHANGES, NO CHANGE TO BUILDING TO FOOTPRINT.
Cost of construction: $23,223
August 27, 2026
Commercial Express · BB-202607532 · PENDING
OTC-LENVILLE VENTURE LLC BLDG B- (XPRS) -- REPLACE 24 EXISTING WINDOWS WITH "LIKE FOR LIKE" REPLACEMENT WINDOWS. ALL WORK TO OCCUR WITHIN EXISTING WINDOW OPENINGS. NO CHANGES TO BUILDING FOOTPRINT. NO STRUCTURAL CHANGES.
Cost of construction: $20,642
August 27, 2026
Commercial Express · BB-202607530 · PENDING
OTC- VENTURE LLC- ALTERATION BLDG A (XPRS) -- COMMERCIAL -BUILDING A
REPLACE 26 WINDOWS WITH LIKE FOR LIKE REPLACEMENT. ALL WORK TO OCCUR WITHIN EXISTING WINDOW OPENINGS. NO STRUCTURAL CHANGES.
Cost of construction: $22,363
August 17, 2026
Multi Family Alteration · BB-202607212 · PENDING
2157 LENOX RD NE (COM)(CC) -- • Replace seventy-seven (77) existing windows with like-for-like replac,ement windows.
• Repair three (3) existing windows.
• All work to occur within existing window openings.
• No structural changes.
• No change to occupancy or means of egress.
• No change to build...
Cost of construction: $66,228
August 6, 2026
Multi Family Alteration · 26TMP-051485 · OTHER
2157 LENOX RD NE -- • Replace seventy-seven (77) existing windows with like-for-like replac,ement windows.
• Repair three (3) existing windows.
• All work to occur within existing window openings.
• No structural changes.
• No change to occupancy or means of egress.
• No change to building footpr...