September 3, 2026
Temporary Power · BT-202601869 · PENDING
Meter replacement -- TEMP POWER
September 2, 2026
Residential - Electrical · BE-202606190 · ISSUED
Meter replacement -- replacing meter and inside panel / disconnect reconnect
September 2, 2026
Residential - Electrical · BE-202606187 · ISSUED
Meter upgrade -- Replacing meter base and inside panel
August 31, 2026
Residential - Electrical · 26TMP-057428 · OTHER
Meter upgrade -- Replacing meter base and inside panel
July 6, 2026
Residential Alteration · BB-202605856 · PENDING
A N X Investment Group LLC - (RES) -- Removal and replacement of any damaged subflooring and floor joists as needed, reconfiguration of the kitchen to an open-concept layout with new cabinetry and finishes, construction of a new full bathroom and laundry area, installation of new flooring, interi...
Cost of construction: $30,000