November 3, 2026
Residential Alteration · BB-202609572 · PENDING
Castro- Malaspina_Alteration (RES) -- Convert existing basement storage room into a half bathroom. install one toilet, one sink, and framing and drywall on existing wall. Included plumbing, electrical, and interior finishes No structural changes or additions.
Cost of construction: $19,000
November 2, 2026
Residential Alteration · 26TMP-071899 · OTHER
Basement half bathroom -- Convert existing basement storage room into a half bathroom. install one toilet, one sink, and framing and drywall on existing wall. Included plumbing, electrical, and interior finishes No structural changes or additions.