October 7, 2026
Residential - Plumbing · BP-202604085 · ISSUED
Park Ave -- 3 toilets, 3 lav. And 3 tub/showers
October 7, 2026
Residential - Electrical · BE-202607090 · ISSUED
BB-202607457 -- Partial Rewire
August 26, 2026
Residential Alteration · BB-202607457 · PENDING
Thomas Ward Project (RES) -- Repair to previous condition following water damage to three levels of home caused by toilet. Repair damaged framing, replace damaged drywall and insulation throughout interior, plumbing repairs including p-trap and reset toilets. Electric repair to outlets, detach an...
Cost of construction: $68,224
August 12, 2026
Building Complaint · 26CAP-00001214 · IN_PROGRESS
WATER/STORM DAMAGE-344 PARK AVE SE -- WATER/STORM DAMAGE-344 PARK SE- STEVE PHOENIX- [contact removed]
August 7, 2026
Residential Alteration · BB-202606901 · PENDING
Ward Project (RES) -- Repair to previous condition following water damage to three levels of home caused by toilet. Repair damaged framing, replace damaged drywall and insulation throughout interior, plumbing repairs including p-trap and reset toilets. Electric repair to outlets, detach and reset...
Cost of construction: $68,224