October 22, 2026
Residential - Plumbing · BP-202604276 · PENDING
1434 DeSoto plumbing -- Rough in plumbing and set out fixtures
September 29, 2026
Residential Alteration · BB-202608491 · PENDING
MALTEV- ALTERATION (RES) -- Renovation of the existing single-family residence, including replacement of drywall, interior flooring, interior and exterior doors, windows, kitchen cabinets, countertops, appliances, bathroom vanities, toilets, sinks, tub, and light fixtures. Repair and paint existi...
Cost of construction: $65,000
September 15, 2026
Residential Addition · BB-202608048 · PENDING
MALTEV (RES) -- 26CAP-00000435
Renovation of existing single-family residence. Work includes interior finishes, sheetrock, flooring, kitchen cabinets and countertops, kitchen appliances, bathroom fixtures and finishes, lighting fixtures, replacement of interior and exterior doors and windows, re...
Cost of construction: $65,000
September 14, 2026
Residential Alteration · BB-202608014 · PENDING
1434 Desoto Ave -- Renovation of existing single-family residence. Work includes interior finishes, sheetrock, flooring, kitchen cabinets and countertops, kitchen appliances, bathroom fixtures and finishes, lighting fixtures, replacement of interior and exterior doors and windows, repair/replacem...
Cost of construction: $65,000
August 25, 2026
Residential Alteration · BB-202607434 · PENDING
MALTEV_ALTERATION (RES) -- PROPOSED NEW SHEETROCK, NEW INTERIOR AND EXTERIOR DOORS, NEW APPLIANCES, NEW CABINETS AND VANITIES NEW LIGHT FIXTURES NEW FLOORING PAINT INETRIOR AND EXTERIOR, REPAIR RAILING AND SIDING WHERE AND IF NEEDED.
Cost of construction: $57,000