2026-07-31
1248249
· Land Disturbance Project · PENDING
Shoal Creek Trunk Sewer Relief - Section 3A PFL -- <div><b>REVISION #1: MULTIPLE CHANGES MADE TO PLANS. TITEL BLOCK REVISED, EXISTING EASMENT LINE TYPE ADDED, TCE REMOVED AND LOD REDUCED TO THE EXISTING EASEMENT 10/16/2026</b></div><div><br></div>SHOAL CREEK SECTION IIIA PRIORITY FIX LIST (PFL) AREAS SCOPE IS A PARTIAL BUILD OF THE SHOAL CREEK SECTION IIIA SCOPE IN ORDER TO PROVIDE TEMPORARY OVERFLOW SEWER STORAGE CAPACITY FOR SELECT LOCATIONS OF THE EXISTING (PARALLEL) SHOAL CREEK TRUNK SEWER. THE PFL AREAS SCOPE WILL REQUIRE PERIODIC PUMP OUT UNTIL THE COMPLETE SHOAL CREEK SECTION IIIA CONTRACT (FUTURE) IS CONSTRUCTED IN FULL. THE PROJECT WILL DISTURB A TOTAL AREA OF APPROXIMATELY 2.59± ACRES. ALL DISTURBED AREAS WILL BE RETURNED TO ORIGINAL GRADE AND STABILIZED WITH MULCHING AND PERMANENT VEGETATION, AND ALL OPEN-CUT TRENCHES WILL BE BACKFILLED AND RESTORED TO CURRENT CONDITIONS TO THE EXTENT PRACTICABLE. THIS IS A LINEAR PROJECT, THE TOTAL DISTURBANCE AND SUBSEQUENT BMP PRACTICES ARE TO BE DONE IN SECTIONS. FINAL GRADE STABILIZATION IS TO OCCUR AS EACH SECTION OF PIPE IS INSTALLED AND INSPECTED. This Project has been approved by Maxtin Fordham. 24 Hour Contact is Cassandra Marshall (678)614-9060
Reported project value $10,000,000
Professionals on this permit ATKINSREALIS (Engineer), Shelton Loggins (Engineer), Steve Zook (Contractor)