2026-10-21
The construction document revisions being submitted as “REV 4 – VE Coordination” incorporate changes made to the building as requested by the Owner to reduce construction cost. The overall building program of spaces, floor levels and uses remains the same and the life safety plans, exiting, fire protection and HVAC systems strategies have not changed, they’ve only been adjusted to the reduced scope. On many sheets, the extent of VE Coordination Revisions are too extensive to cloud individually so the drawing sheet number is clouded or the entire drawing is clouded.
Refer to detailed Narrative PDF uploaded.