2026-10-01
NARRATIVE OF CHANGES – DELTA 2
A2.0 – First Floor Plan
1. Reconfigured guest bathroom layout.
2. Reconfigured washer/dryer location.
3. Reconfigured master bathroom layout.
4. Reconfigured pool bathroom layout.
5. Added dog wash area in garage.
A3.0 – Second Floor / Floor Plan
1. Reconfigured guest bathroom layout.
2. Reconfigured washer/dryer location.
3. Reconfigured master bathroom layout.
4. Reconfigured pool bathroom layout.
5. Added dog wash area in garage.
6. Shifted exterior wall at Bedroom 3.
7. Reconfigured second-floor office layout.
8. Modified select exterior windows to coordinate with revised floor plan.
A4.0 – Framing Plan
1. Revised framing at the front-right corner of the residence.
A5.0 – Exterior Elevations
1. Modified select exterior windows to coordinate with revised floor plan.
A8.0 – Lighting Plan
1. Revised lighting layout to coordinate with floor plan revisions.
2026-09-29
NARRATIVE OF CHANGES:
A0.0:
1. ADDED CMU FENCE / GATE CLOSE TO FRONT PROPERTY LINE
2. POOL DECK HAS BEEN RAISED TO MATCH REAR PORCH.
THIS DOES NOT EFFECT IMPERVIOUS, JUST ACCESS. NO STAIRS ARE REQUIRED.
A3.0:
A4.0 / A5.0 / A5.1:
1. KITCHEN LAYOUT IS RECONFIGURED AND WINDOWS HAVE BEEN MODIFIED.
1. FRAMING AT FRONT CORNER OF HOME REVISED AND ELEVATION OF GAET ADDED.
1