2026-08-15
Remove existing roof and all felts to enable inspection of roof sheathing/decking, replace any rotten/damaged decking and re-nail entire roof deck to code. Install high temperature peel and stick metal roof underlayment, install new flashings and drip edge/edge metal, install 24 gauge pre-finished colored standing seam, double lock metal roof with no exposed fasteners. Vented ridges on all ridges.
Professionals on this permit FLORIDA CUSTOM ROOFING INC (Licensed Professional)