2026-08-13
Bytebridge TCL Atlanta GA -- Fabricate and install 4" schedule 10 304L stainless steel Technology Cooling Loop. Hydrostatic pressure test piping to 1.5x design pressure, flush with potable water.
2026-08-13
Bytebridge TCL Atlanta GA -- Fabricate and install 4" schedule 10 304L stainless steel Technology Cooling Loop. Hydrostatic pressure test piping to 1.5x design pressure, flush with potable water.
Reported project value $629,000
Application Square Footage 5412
Professionals on this permit Colston Mechanical LLC (General contractor)
2026-07-15
Quality Technologies - 1033 JEFFERSON NW ST
More Than 4 Stories or Floors No