← Back to leads
Permit history › Marietta, GA › Tillery Ln SW › 1092 Tillery Ln SW, Marietta 30064

Property History

1092 Tillery Ln SW, Marietta 30064

One permit is on file for 1092 Tillery Ln SW, Marietta 30064: Building/Residential/New Home/NA, filed July 21, 2026 (status: ISSUED), with WADE ELECTRIC INC as licensed professional (elec).

Property

JurisdictionCobb County (unincorporated), GA
Parcel ID19020000060
Permits on file1
FiledJuly 21, 2026

Permit History (1 permit, all statuses)

2026-07-21
2026-005843 · Building/Residential/New Home/NA · ISSUED
SINGLE FAMILY STICK BUILT NEW CONSTRUCTION SINGLE FAMILY HOME --TILLERY, LOT 4-- ZONED R-30. OK FOR NEW HOUSE W/IN REQD SETBACKS. MAX IMP 35%. MAX HEIGHT 35 FT. NOTE - BEFORE CALLING IN ROUGH INSPECTIONS PLEASE SEND AN AS BUILT HEIGH VERIFICATION TO HEIGHTVERIFY@COBBCOUNTY.ORG (HEIGHT IS MEASURED FROM THE MEAN GROUND LEVEL OF THE FRONT ELEVATION TO THE MEAN OF THE HIGHEST ROOF STRUCTURE) PROVIDE AN AS BUILT FRONT ELEVATION, LETTERS AND SITE PLANS WILL NOT BE ACCEPTED. This lot has a designated tree protection area, the dimensions of which are on file with the Cobb County Community Development Agency. The homebuilder is responsible for maintaining this area in an undisturbed condition until the release of the certificate of occupancy. Protective fencing must be installed and maintained according to Cobb County standards. This must be verified prior to the issuance of the Certificate of Occupancy. The homebuilder must use the online Accela Citizens Access Portal to request an Arborist inspection at least 3 days prior to the date that the inspection is needed. Any infringements into the tree protection areas must be mitigated prior to release of the Certificate of Occupancy. This lot requires trees to be planted in accordance with the approved Tree Protection and Replacement Plan for this subdivision. Tree planting locations, planting methods and plant material (size, species, and quality) must be in accordance with the approved plan. This must be verified prior to the issuance of the Certificate of Occupancy. The homebuilder must use the online Accela Citizens Access Portal to request an Arborist inspection at least 3 days prior to the date that the inspection is needed. This lot requires an individual site plan to be reviewed and approved by the Cobb County Arborist or Landscape Architect prior to the issuance of a building permit. The site plan must include a surveyed location of any specimen trees, the critical root zone of each specimen tree equal to one radius foot per inch of diameter, locations and dimensions of proposed improvements and existing and proposed grades. If county staff determines that impacts to the specimen tree(s) will be too great, mitigation measures for the tree(s) per Cobb County Tree Ordinance requirements must be established before a building permit can be issued. Tree protection fencing must be installed prior to commencement of construction of the house and maintained throughout the construction process. The condition of the tree(s) must be verified prior to release of the Certificate of Occupancy for the house. The homebuilder must use the online Accela Citizens Access Portal to request an Arborist inspection at least 3 days prior to the date that the inspection is needed. If the critical root zone for the tree(s) is found to have been violated, mitigation measures will be required prior to release of the Certificate of Occupancy. This lot has a designated Zoning and or State Waters buffer, the dimensions of which are on file with the Cobb County Community Development Agency. The homebuilder is responsible for planting any required landscape material or maintaining this area in an undisturbed condition until the release of the Certificate of Occupancy. Required landscape material must be installed according to Cobb County standards, or protective fencing must be installed and maintained according to Cobb County standards. This must be verified prior to the issuance of the Certificate of Occupancy. The homebuilder must request an Arborist inspection at least 3 days prior to the date that the inspection is needed. Any encroachments into the landscape buffer must be mitigated prior to release of the Certificate of Occupancy. All future property owners are required to maintain this buffer in perpetuity per Cobb County standards. ELEVATION CERTIFICATE REQUIRED. 2ND ELEVATION CERTIFICATE REQUIRED. 7-21-26 MBV 1ST ELEVATION CERTIFICATE RECEIVED. 8-4-26 MBV
Professionals on this permit WADE ELECTRIC INC (Licensed Professional (ELEC))

Other addresses on Tillery Ln SW with permit history

About this data

These are public permit records for Cobb County (unincorporated), GA, collected from the official permit portal. Records can be incomplete or out of date, so check with the issuing agency before relying on them. Stamptd is not affiliated with any government agency.