2026-08-22
D02 - Guards and Railings
2026-08-22
Deferred submittal of Structural Steel Shop Drawings and supporting engineering documentation in response to the Structural Steel conditional permit hold. Documents have been reviewed by the Registered Design Professional in Responsible Charge and found to be in general conformance with the approved construction documents.
Approval is respectfully requested in accordance with FBC Section [A] 107.3.4.1 to satisfy and release the Structural Steel deferred submittal hold.
2026-08-22
Provide a wet pipe system of automatic sprinklers in Building 5000