2026-08-22
1. Remove & dispose of existing roof structure including temporary tarps, remaining metal panels, plywood sheathing, and trusses / remedial framing repairs done after hurricane Ian.
2. Installation of new 2x6 SYP rafters and 1/2" CDX Sheathing.
3. Installation of new aluminum 5V crimp metal roof system (replace existing like for like)
4. Replace modified bitumen flat roof with single ply TPO.