2026-09-25
Commercial Permit Extension
2026-09-21
No description on file.
Status changes we observed IN_PROGRESS (September 21, 2026) → WITHDRAWN (September 22, 2026)
2026-09-10
Update food service equipment per Dutch Bros request Updated location of EF-2.
Removed receptacle for the EQ-6 & EQ-11 and added receptacle for EQ-21 & EQ-24.
Updated Kitchen equipment schedule.
Removed power connections for EQ-6 and EQ-11 and added power connections for EQ-21 and EQ-24 to Panel B. Updated HVAC floor plan as per architectural changes. Revised the Exhaust fan, Air Terminal schedules. Changed EF-2 to inline fan, updated associated duct work and added Exhaust grille.
Added section view for the mech room. Removed P-9 from the plumbing fixture schedule.
Removed P-4 from the kitchen fixture schedule.
Updated the WFU table as per the architectural updates.
Removed the cold water/hot water pipes as per the architectural updates.
Updated water risers as per the architectural updates.
Professionals on this permit BEAR GLOBAL CONSTRUCTION INC (Licensed Professional)