165 Avery -- System placement-
4 ton main in basement mech.
3 Ton up (horizontal)in attic Trane 95% furnaces
2ton basement in basement mech room-heatpump
2ton pool house in pool house mech room-heatpump
Zoned-no
Dampers- no
Bypass- no
Lineset- 3-75’x3/4”, 1-50’x7/8”
B-vent- (2)-3” pvc for concentric kits
Waterheater- No (tankless)X2
Floor boots-yes
Venthood- Yes 10” with makeup air/SIDEWALL
14” flex- Yes
Rough Notes:
*ERV ON MAIN-4TON
*DEHUMIDIFIER FOR BASEMENT IN BASEMENT MECH ROOM
*all 4” bathfans
*Run drain lines to hub drain
*TAKE CLEAR VINYL FOR BASEMENT AND POOL HOUSE SYSTEMS
*Will need an 8” roof cap for makeup air
*Install (4) 16x25x4 Honeywell F100 media filters
*Install both furnaces on blocks to give drain lines more slope
*Install the make up air off of the 4 ton system
*The 10” venthood/SIDEWALL WITH MUA
*All metal plenums and y's only
Gaslines: (READY BUT 1 FP WILL BE ON STANDBY)
2- Furnaces, 2- 3/4" Tankless WH, 1- 3/4” Range, 2-LL,1- Back Pipe)MAIN FLOOR FP TO MECH ROOM BELOW
Scope Code R1 Single Family Residence
Building Type New
Professionals on this permit STUART MECHANICAL SERVICES INC (General contractor)
Status changes we observed PENDING (September 22, 2026) → ISSUED (September 23, 2026)