2026-10-06
Install New Trane Run Tru 2Ton Air Handler and Heat Pump 100% 24 btu and R8 duct work.
Reported project value $9,943
Professionals on this permit APEX RESIDENTIAL SOLUTIONS LLC (HVAC Contractor)
2026-09-15
40% DAMAGE ASSESSED (NO VINYL SIDING)
PROJECT SCOPE & TECHNICAL SPECIFICATIONS (IN KIND)
1. STRUCTURAL FRAMING & REMEDIATION
· TRUSS REPAIRS: REPLACE CHARRED 2X4 MEMBERS IN EXISTING ROOF TRUSSES TO MATCH ORIGINAL ENGINEERING SPECS; NO OTHER STRUCTURAL MODIFICATIONS PERMITTED.
· PATIO DOOR/OPENING INFILL: INFILL THE DESIGNATED PATIO DOOR OPENING WITH NEW 2X4 WOOD STUDS @ 16" O.C., ANCHORED PER LOCAL BUILDING CODE.
· INSULATION INSTALLATION: INSTALL R-13 INSULATION IN ALL EXTERIOR WALLS AND R-30 INSULATION IN THE CEILING/ROOF CAVITIES.
2. ROOFING & DRAINAGE SYSTEM
· SUBSTRATE PREPARATION: TEAR OFF EXISTING SHINGLES, INSPECT THE ROOF DECK, AND REPLACE ALL ROTTEN OR DAMAGED SHEATHING.
· UNDERLAYMENT & SHINGLES: INSTALL NEW TITANIUM SYNTHETIC UNDERLAYMENT AND NEW ASPHALT SHINGLES PER MANUFACTURER SPECIFICATIONS.
· GUTTER ASSEMBLY: SUPPLY AND INSTALL NEW GUTTERS WITH 4" DOWNSPOUT PIPES SECURED TO THE EXISTING STRUCTURE.
3. EXTERIOR WALL CLADDING
· SIDING REMEDIATION: REMOVE DAMAGED SIDING; INSTALL NEW BOARD & BATTEN PANELS TO MATCH THE EXISTING PROFILE AND TEXTURE.
· WEATHER ENVELOPE: INTEGRATE NEW HOUSE WRAP, STEP FLASHING, AND COUNTER FLASHING AT ALL ROOF/WALL INTERSECTIONS.
· ROOFLINE CLEARANCE: MAINTAIN A 1" TO 2" GAP BETWEEN THE BOTTOM EDGE OF THE NEW SIDING AND THE NEW ASPHALT SHINGLES.
4. INTERIOR FINISHES & FIXTURES
· GYPSUM WALLBOARD: INSTALL, TAPE, AND MUD NEW 1/2" DRYWALL ON ALL INTERIOR WALLS AND CEILINGS PER MANUFACTURER SPECS.
· OPENINGS & MILLWORK: INSTALL NEW DOORS WITH MATCHING HARDWARE, REPLACE DAMAGED WINDOWS, AND INSTALL NEW KITCHEN CABINETS.
· FINISHES: PREP SURFACES AND INSTALL NEW FINISH FLOORING THROUGHOUT THE ENTIRE SPACE.
5. MECHANICAL, ELECTRICAL, & PLUMBING (MEP)
· HVAC SYSTEM: FURNISH AND INSTALL A COMPLETE NEW HVAC SYSTEM, INCLUDING EQUIPMENT, DUCTWORK, GRILLS, AND REGISTERS.
· ELECTRICAL SYSTEM: WIRE A COMPLETE NEW SYSTEM, INCLUDING DEVICES, LIGHTING FIXTURES, AND A NEW 200-AMP MAIN DISTRIBUTION PANEL.
· PLUMBING SYSTEM: REPLACE ALL COMPROMISED PIPING, AND SUPPLY NEW PLUMBING FIXTURES, FITTINGS, AND APPLIANCES THROUGHOUT.
Reported project value $168,673
Professionals on this permit ARTLANTIC INC (Contractor), ARTLANTIC INC. (Contractor)
2026-08-27
200 Amp Meter & Panel
80 Single Gang Boxes
1 Stove (220)
1 Dryer (220)
1 Water Heater (220)
1 Air Handler (220)
1 A/C Condensor (220)
Reported project value $5,000
Professionals on this permit SALEHA REAL ESTATE (Electrical Contractor)