2026-09-29
The West Venue (LC) (CC) -- Proposed covered roof and concrete patio at front entry of building. Patio includes steps and handrail. Landscaping lighting included in scope of work.
Reported project value $100,000
Application Square Footage 900
Professionals on this permit Mark Greer Inc. (General contractor)
2026-08-31
SUMMARY:
The scope of work at the project address will require a Lite Commercial Alteration
Permit, to update the exterior front and side of the building.
The building is a venue space for events. The front and side entry of the
building are in need of repairs and the owners are seeking to refresh the front
and side faces of the building. The scope of work includes leveling out all
the uneven concrete surfaces that touch the front of the building and convert
it into a leveled concrete patio. This leveled patio would be 12ft deep from
the face of the building. The patio would have some steps, guardrail and be
Handicap accessible. The patio would be a stone veneer fi nish.
Scope PSAP- OTHER SAPS
Zoning 1 I-1
Zoning 2 C-1
SPI Zoning undefined
CDP Land Use I
Zoning Overlay Upper Westside CID, Upper Westside OLY
2026-08-28
No description on file.
Status changes we observed OTHER (August 28, 2026) → CLOSED (August 31, 2026)
2026-08-27
No description on file.
Status changes we observed OTHER (August 27, 2026) → CLOSED (August 27, 2026)
2026-08-24
No description on file.
Status changes we observed OTHER (August 24, 2026) → CLOSED (August 24, 2026)
2026-08-10
No description on file.
2026-07-16
The West Venue -- Proposed covered entry at the exterior front door of the building. The scope of work includes a front patio, guardrail and steps at the front entry. Exterior lighting around this proposed space would also be included.
Reported project value $100,000
Application Square Footage 900
Professionals on this permit The Landmark Group (General contractor)