2026-08-18
Revised Civil Plans:
Sheet C-201
- Revised the location of the trenching and pavement replacement from E 2nd Ave to E 3rd Ave to
align with the new proposed utility connection locations.
Sheet C-501
- Revised the location of the potable water connection from E 2nd Ave to E 3rd Ave. Revised the
proposed waterline from 2” to 3” with a 2.5” water meter.
- Revised the location of the sanitary sewer line from E 2nd Ave to E 3rd Ave.
Professionals on this permit STEWART BUILT, LLC (Licensed Professional)