2026-09-13
1810 Moroe -- Replacing faulty breaker service panel.
2026-09-13
1810 Moroe -- Replacement of 200 amp service panel.
2026-09-13
1810 Moroe -- Replace existing 200A main service panel with new 200A load center. Upgrade grounding electrode system as required.
No change to service size. Existing branch circuits will be re-terminated. Coordinate disconnect/reconnect with Georgia
Power
2026-09-13
1810 Monroe Dr, Electric Update -- Remove existing 150-amp outdoor meter socket (meter base) and replace with a new 200-amp rated meter base.
Remove existing 150-amp main breaker panel (load center) and install a new 200-amp main breaker panel.
Provide and install all necessary interior breakers corresponding to existing circuit loads.