2026-09-04
Gregory Gore - Battery -- BATTERY INSTALLATION
(1) PW3 and (1) PW3 expansion to be mounted on the left side of the home - stacked between the 2nd and 3rd window; all other equipment to be mounted to the right of the meter on the exterior wall - right side of the home;
200/100 gateway 3 to be fed by the meter with #2 al; gateway to feed interior panel with #3 cu (current wires are cloth);
battery breaker to land in the gateway;
Total Square Footage 2
Professionals on this permit ABEV POWER SOLUTIONS (General contractor)
Status changes we observed PENDING (September 4, 2026) → ISSUED (September 8, 2026)