2026-08-19
Electrical Permit for BB-202506277 -- Electrical Permit for BB-202506277
POWER AND FIBER TO BE PROVIDED FROM DATA CENTER. FOR THE FIBER CONDUIT, SPACEX/TEP WILL BE ALLOWED TO HANDLE THE ENTIRE INSTALLATION OF THE CONDUIT FROM THE ANTENNA FIELD TO THE ASSIGNED VAULT. THEN FROM THE VAULT, SPACEX/TEP WILL HANDLE THE PULLING OF THE 40 COUNT FIBER TO AN ASSIGNED 2 POST LOCATION IN OUR MMR AND TERMINATE TO A 1RU PATCH PANEL WITHIN THAT 2 POST. FOR THE POWER, SPACEX/TEP WILL BE ALLOWED TO RUN THE POWER FROM THE ANTENNA FIELD AND THROUGH OUR BUILDING UP TO THE ASSIGNED SWITCHBOARD. TERMINATION AT THE SWITCHBOARD WILL BE HANDLED BY EDGED.
Scope Code U2 Communications Facility
Building Type New
Total Square Footage 2539
Professionals on this permit ATLANTA, GA, ELEC CONT EN218333 (General contractor)
Status changes we observed PENDING (August 19, 2026) → ISSUED (August 20, 2026)
2026-08-18
Electrical Permit for BB-202506277 -- Electrical Permit for BB-202506277
2026-07-30
ATL1 Data Center Electrical -- THE SCOPE OF WORK INCLUDES INSTALLATION OF GRAVEL PARKING AREA CONNECTING AN EXISTING GRAVEL ACCESS DRIVEWAY TO A PROPOSED FENCED GRAVEL COMPOUND WITH COMMUNICATIONS EQUIPMENT (40 ANTENNAS AND 1 HEADEND EQUIPMENT RACK). POWER AND FIBER TO BE PROVIDED FROM DATA CENTER. FOR THE FIBER CONDUIT, SPACEX/TEP WILL BE ALLOWED TO HANDLE THE ENTIRE INSTALLATION OF THE CONDUIT FROM THE ANTENNA FIELD TO THE ASSIGNED VAULT. THEN FROM THE VAULT, SPACEX/TEP WILL HANDLE THE PULLING OF THE 40 COUNT FIBER TO AN ASSIGNED 2 POST LOCATION IN OUR MMR AND TERMINATE TO A 1RU PATCH PANEL WITHIN THAT 2 POST. FOR THE POWER, SPACEX/TEP WILL BE ALLOWED TO RUN THE POWER FROM THE ANTENNA FIELD AND THROUGH OUR BUILDING UP TO THE ASSIGNED SWITCHBOARD. TERMINATION AT THE SWITCHBOARD WILL BE HANDLED BY EDGED.