2026-09-28
Tilford Yards ATL1-0 (LC)(CC) -- Installing underground raceway and wiring from Utility Sub Station to MV Switches. MV switches will feed 4- 4000A switchgears. Installing raceway and wiring for data hall fit out, added light fixtures, receptacles and mechanical equipment.
Scope Code U2 Communications Facility
Building Type Existing
Total Square Footage 53000
Professionals on this permit IES COMMERCIAL INC (General contractor)
2026-09-28
Tilford Yards ATL1-0 (LC)(CC) -- Install underground raceway and wiring from Utility Sub Station. This will feed 4 - 4000A Switchgears which will feed additional mechanical equipment and data hall fit out. Adding additional lighting and receptacle circuits.
2026-09-25
Tilford Yards ATL1-0 (LC)(CC) -- Installing underground raceway and wiring from Utility Sub Station to MV Switches. MV switches will feed 4- 4000A switchgears. Installing raceway and wiring for data hall fit out, added light fixtures, receptacles and mechanical equipment.
2026-08-20
VIA Delivery & Logistics LLC -- Zoning approval for VIA Delivery & Logistics to operate as an Amazon Delivery Service Partner (DSP) at the existing DFT4 delivery station. Operations will consist of local last-mile package delivery services. Delivery drivers will dispatch from the existing Amazon delivery station, load assigned packages into delivery vehicles, complete local delivery routes, and return vehicles to the station. No construction or modifications to the existing facility are proposed.
2026-08-20
Edged ATL5.6 MW Data Center (COM)(CO) -- Tenant fitout of first and second floors on side B, adding electrical rooms on North East side of the first floor, fitting out a data hall on the first and second floors, and adding chillers to the exterior yard on the North East side of the building.
Reported project value $44,445,616
Application Square Footage 209759
Professionals on this permit MG2 (General contractor)
2026-08-14
Plateau Underground -- Install a fire loop and risers
Professionals on this permit ATLANTA, GA, (General contractor)
2026-08-11
Edged ATL5.6 MW Data Center -- Tenant fitout of first and second floors on side B, adding electrical rooms on North East side of the first floor, fitting out a data hall on the first and second floors, and adding chillers to the exterior yard on the North East side of the building.
2026-08-11
Edged ATL5.6 MW Data Center (COM)(CO) -- Tenant fitout of first and second floors on side B, adding electrical rooms on North East side of the first floor, fitting out a data hall on the first and second floors, and adding chillers to the exterior yard on the North East side of the building.
Reported project value $44,445,616
Application Square Footage 209759
Professionals on this permit MG2 (General contractor)
2026-07-30
Property Maintenance -- Overgrowth on vacant lot / CLBurdin