2026-09-28
3189855
· Structural Building Permit · PENDING
2386 Tyler Way - Residential Driveway Widening -- New 315 SF concrete driveway widening alongside the existing residential driveway. 4-inch slab, 3,000 PSI, broom finish. Begins at the top edge of the existing county apron, tapers from zero to 9 feet wide over the first 20 feet, then continues at 9 feet wide for 25 feet, terminating at the existing walkway. Total run approximately 45 feet. Attached to and running parallel with the existing driveway along its full length; not a separate parking pad. No structural work. No grading beyond light surface work. No work within the county right-of-way or existing apron. Existing impervious 2,446.13 SF (21.80%); proposed total 2,761.13 SF (24.63%), under the 35% R-75 cap for both front yard and overall coverage. Corrects DeKalb County Code Compliance Case #1316822, Section 27-6-1 3B6 (vehicles parking on unpaved surface). Sealed boundary survey by McClung Surveying (Michael R. Noles, GA RLS 2646). Stamped site plan by AQA Engineering (John Addington, PE). DRIVEWAY ADDITION ONLY.<div><font color="#d5000e">Application is closed - 20262110</font></div>
Reported project value $5,745
Professionals on this permit Quality Concrete solutions LLC (Contractor)