2026-07-31
2026-006243
· Building/Residential/New Home/NA · ISSUED
SINGLE FAMILY STICK BUILT NEW HOUSE
ZONED R-30 OK FOR A NEW HOME, WITHIN THE REQ. SETBACKS, MAX. IMPERV. 35%. max height 35ft from mean elevation to midpoint of tallest roof structure.
This lot has a designated tree protection area, the dimensions of which are on file with the Cobb County Community Development Agency. The homebuilder is responsible for maintaining this area in an undisturbed condition until the release of the certificate of occupancy. Protective fencing must be installed and maintained according to Cobb County standards. This must be verified prior to the issuance of the Certificate of Occupancy. The homebuilder must use the online Accela Citizens Access Portal to request an Arborist inspection at least 3 days prior to the date that the inspection is needed. Any infringements into the tree protection areas must be mitigated prior to release of the Certificate of Occupancy.
This lot requires trees to be planted in accordance with the approved Tree Protection and Replacement Plan for this subdivision. Tree planting locations, planting methods and plant material (size, species, and quality) must be in accordance with the approved plan. This must be verified prior to the issuance of the Certificate of Occupancy. The homebuilder must us the online accela citizens access portal to request and arborist inspection at least 3 days prior to the date that the inspection is needed.
This lot has a designated Zoning buffer, the dimensions of which are on file with the Cobb County Community Development Agency. The homebuilder is responsible for planting any required landscape material or maintaining this area in an undisturbed condition until the release of the Certificate of Occupancy. Required landscape material must be installed according to Cobb County standards, or protective fencing must be installed and maintained according to Cobb County standards. This must be verified prior to the issuance of the Certificate of Occupancy. The homebuilder must request an Arborist inspection at least 3 days prior to the date that the inspection is needed. Any encroachments into the landscape buffer must be mitigated prior to release of the Certificate of Occupancy. All future property owners are required to maintain this buffer in perpetuity per Cobb County standards.
No impervious bypass allowed. All impervious runoff must drain to street or prop swale in rear.
The minimum floor elevation shall be at least 3.0 feet above the local 100 yr headwater pool elevation(s), unless pooling runoff will bypass the building with 1.0 foot of freeboard protection. Builder shall provide an adequate swale between/behind the houses to accommodate any overflows from the inlet. Individual site plans must be prepared for these lots to demonstrate how overflows from inlets at these lots will bypass the buildings and how runoff will be directed in accordance with the approved hydrology study. The homes first floor/garage elevation must be 1’ above the top of curb.
Site plans must be prepared subject to the requirements of the cobb county code 58-68(3). Lowest floor elevations shall be no less than three (3) feet above the 100-year flood hazard area or 1' above the low point in the downstream roadway as applicable, whichever is greater. An elevation certification, prepared by a registered land surveyor, is required prior to footing inspection.
Professionals on this permit SEYLER ELECTRIC (Licensed Professional (ELEC))