2026-09-09
There was a change to the plan for sheet C4, Grading and Drainage Plan. The revision was to the ramp leading to the right-of-way. The original ramp was too steep based on grades exhibited in the field. The revision was to change of a straight ramp it has been reconfigured to be an L-shaped ramp with a landing to meet slopes.
Professionals on this permit VAN BEBBER & ASSOCIATES INC (Licensed Professional)