2026-07-15
BLDGCOMM-26-0566
· Building (Commercial) -Other Non-Residential Buildings · ISSUED
Quik Trip #817 -- This is a retrofit of the drink machines does not require any changes to the structure or walls. The scope of work involves the removal and/or relocation of the existing fountain machines, tea machines, frozen bar machines and millwork along with replacement of existing condensing units on the roof. We will also be removing the multiplex and corresponding condensing unit on the roof and replacing with a glycol chilling system. Electrical will involve modifications as required to re-feed equipment including relocation of existing devices and relocation of existing light fixtures to align with new millwork and equipment. Plumbing will involve relocation and routing of waste, vent, and water lines for the new and relocated equipment as well as the potential addition of a floor sink
Professionals on this permit AART ELECTRICAL SERVICES (Electrical Contractor), Ascent Construction Group (General Contractor), Presley Inc (Plumbing Contractor), R&R Sales & Service Inc. (Mechanical Contractor)