2026-07-02
2026-005250
· Building/Residential/New Home/NA · ISSUED
SINGLE FAMILY STICK BUILT NEW CONSTRUCTION SINGLE FMAILY HOME --LINDEN GROVE, LOT 12--
R-15/OSC, PER. Z-19 OF 2021 OK FOR NEW HOME. Within the req. setbacks. max. imperv. 5250 SQUARE FEET Exterior elevation to include a minimum of 50% brick or stacked stone. The detention pond shall have a minimum of six-foot black vinyl clad fencing. There will be a minimum lot size of 13,000 square feet between lots 66 through 74 that border the R-20 lots to the south of it.(PT 284/88)
Site plans must be prepared subject to the requirements of the cobb county code 58-68(3). Lowest floor elevations shall be no less than three (3) feet above the 100-year flood hazard area. An elevation certification, prepared by a registered land surveyor, is required prior to footing inspection.
The minimum floor elevation shall be at least 3.0 feet above the local 100 yr headwater pool elevation(s), unless pooling runoff will bypass the building with 1.0 foot of freeboard protection. Builder shall provide an adequate swale between/behind the houses to accommodate any overflows from the inlet. Individual site plans must be prepared for these lots to demonstrate how overflows from inlets at these lots will bypass the buildings and how runoff will be directed in accordance with the approved hydrology study. The homes first floor/garage elevation must be 1’ above the top of curb.
ELEVATION CERTIFICATE RECEIVED.
2ND ELEVATION CERTIFICATE REQUIRED. 7-17-26
Professionals on this permit WADE ELECTRIC INC (Licensed Professional (ELEC))