2026-09-02
Minor stucco repairs, removal and replacement of sheathing/framing along with adjacent shingle roof sections, minor interior repairs, minor exterior painting where stucco was repaired.
3rd Story Balconies (Units 2–4)
· Remove parapet wall assemblies at both the interior/exterior faces, including scuppers, stucco, WRB and all damaged sheathing/framing.
· Remove and store balcony railing for reuse.
· Remove and store adjacent roof gutters for reuse.
· Remove approximately 3–4 LF of adjacent asphalt shingle roof assemblies, including flashing, underlayment and damaged sheathing/framing.
· During removal, all damaged sheathing/framing should be removed entirely. Including removal and replacement of portions of the balcony waterproofing system that may be necessary.
· Repair any damaged interior finishes to match existing, including the damaged ceiling gypsum board at Unit 4.
· Reinstall asphalt shingle roof assemblies, ensuring proper integration with parapet walls and flashed in accordance with FRC.
· Reinstall stucco and scuppers at parapet walls, ensure WRB is wrapped over top of walls and integrated properly.
· Install coping at parapet walls.
2nd Story Balconies (Units 1, 5–7)
· Create access hole within garage ceiling beneath balconies to assess condition of sheathing and framing.
· Remove and store balcony railing/screen if applicable.
· Remove exterior wall assemblies at balcony edges, corners, and adjacent walls including stucco, WRB and all damaged sheathing/framing.
· Remove 6 inches of stucco cladding below termination of wood framing into CMU.
· Remove 1 foot of stucco cladding at exterior walls past balcony edges.
· Remove balcony edge flashing and enough balcony waterproofing coating to allow reintegration.
· Remove all damaged sheathing/framing entirely.
· Repair any damaged interior finishes to match existing.
· Reinstall stucco at balcony edges/columns and WRB continuously around edges.
· Reinstall balcony waterproofing and edge flashing. Ensure proper integration.
2026-08-24
Minor stucco repairs, removal and replacement of sheathing/framing along with adjacent shingle roof sections, minor interior repairs, minor exterior painting where stucco was repaired.