2026-10-16
FP002:
1. Site plan updated to show new fire main routing.
FP100:
1. 3” drain line in Stair 1 and overhead routing to Supervisor 125 removed.
FP101:
1. Due to the ceiling type used in the Elevator Lobby being open to the structure above, upright sprinkler protection shall be added in the ceiling space above the open grid type ceiling per NFPA 13 2019 Edition Section 9.3.14.3.1.
FP901:
1. 3” drain line in Stair 1 removed.
Professionals on this permit PYE-BARKER FIRE & SAFETY, LLC DBA COX FIRE PROTECTION (Licensed Professional)
2026-09-10
add 1238 fire sprinkler heads in conjunction with the GC permit.
Professionals on this permit PYE-BARKER FIRE & SAFETY, LLC DBA COX FIRE PROTECTION (Licensed Professional)