2026-10-07
Revision 7 to permit BLD-26-0524314. Replace the rooftop packaged unit serving the new Primary Packaging Room with a Munters desiccant unit, air-cooled chiller, and steam generator on ground-level platforms or wall-mounted at the rear. Route ductwork to the roof through the existing roof opening. Change the Secondary Packaging ceiling from drywall to a suspended acoustic ceiling; remove redundant doors in two packaging rooms while retaining the existing doors as primary egress; add a detail for the conveyor opening in the existing masonry bearing wall between rooms; and update related electrical circuits.
Professionals on this permit MBIII GROUND SERVICES LLC (Licensed Professional)
2026-09-25
Lonza Phase II Bottling Room
Addition of Sprinkler Heads to New Bottling Room
Professionals on this permit IMPACT FIRE SERVICES LLC (Licensed Professional)
2026-09-01
dsvvds
Professionals on this permit MBIII GROUND SERVICES LLC (Licensed Professional)
2026-08-21
Clarification Sketches for In Field Changes
Professionals on this permit A STEP ABOVE PLUMBING INC (Licensed Professional)