2026-07-16
Atlanta Memorial Park -- Repair of eroding stream bank caused by fallen tree within Atlanta Memorial Park. DWM will use natural channel design
to repair the streambank using toe rock to protect the toe of the bank. Vegetate soil lifts will be implemented to stabilize
the middle and top portions of the bank. The bank will be graded to match adjacent slopes. Native planting will replace
trees lost to construction.