2026-08-05
2026-006355
· Cobb Building Permits tab record (no distinct type field on this tab) · PENDING
REMODEL -- REMODEL
Reported project value $3,105,529
Mixed Use No
Occupancy Utility, miscellaneous
Project Type Remodel
Power Use Only Yes
Square Footage 766
2026-07-21
REMODEL REMODEL - DEMO AND REPLACEMENT OF LIME FEED SYSTEM
COBB WATER
The Project consists of the following major elements: Demolition and replacement of the existing lime feed system at the R.L. Sutton Water Reclamation Facility with a new Dry Hydrated Lime Storage Silo and a liquid lime slurry storage tank. The new system will be designed to include a larger capacity hydrated lime silo, mixing equipment, addition of a liquid lime storage tank, replacement of the dosing equipment, and all related apparatus and utility connections. Installation of new equipment to be sequenced with demolition of existing to maintain plant operations. Sitework includes electrical ductbank and micro-piles.
Reported project value $3,105,529
Mixed Use No
Occupancy Utility, miscellaneous
Project Type Remodel
Power Use Only Yes
Square Footage 766