2026-09-28
SANITARY SEWER INSTALLATION -- INSTALLATION OF NEW PUBLIC SANITARY SEWER AND ASSOCIATED ROADWAY IMPROVEMENTS ALONG WEST LAKE AVE NW BETWEEN MADRONA STREET AND HASTY PLACE. INCLUDES +515 LF OF NEW 8” DIP GRAVITY SEWER MAIN, TWO NEW MAINHOLES (SMH I.1 & I.2) AND A 6” SEWER LATERAL, TYING INTO THE EXISTING CITY SYSTEM, WITH +32 LF INSTALLED IN 18” STEEL CASTING AT A STORM LINE CROSSING. ASSOCIATED ROADWAY WORK INCLUDES FULL-DEPTH PAVEMENT REPLACEMENT (+4,500SF), MILL & INLAY (+12,730SF), AND DOUBLE-YELLOW RESTRIPING. EXISTING SIDEWALK AND HANDRAILS REMAIN IN PLACE AND PROTECTED.
Reported project value $210,000
Application Square Footage 515
Professionals on this permit GRANT SHEPHEARD (General contractor)