2026-08-13
Cumberland Sweep Segment F Connector - Phase 2 Erosion Control This is the phase 2 erosion control submittal per guidance from David Griffin. Permit revision fee was paid 8/13/26 under SPR-2026-00024.
The project is a proposed segment of the Cumberland Sweep multiuse trail. It will connect to a trail currently under construction as part of the Convention Center redevelopment, continue along Cobb Pkwy to a new ramp up to the pedestrian bridge over Cobb Pkwy, continue across the bridge and through a revitalized greenspace at the NE corner of the Cumberland Mall property, and terminate at the west side of the bridge over Cumberland Mall loop road.
Professionals on this permit Kimley-Horn (Engineer), TerraMark Land Surveying, Inc. (Surveyor)