2025-11-25
1247890
· Land Disturbance Project · VOID
VOIDED KZ Emission -- The proposed project involves the placement of a pre-manufactured emissions-testing shed at 6009 Memorial Drive. No grading, excavation, soil removal, or alteration of the existing ground surface will occur. The general contractor will secure the structure using engineered ground screws installed directly into the existing soil to stabilize the shed per manufacturer requirements. These ground screws do not require trenching or earth disturbance.<div><br></div><div><font color="#d5000e"><b>Project due to close out 5/8/2026</b></font></div>