2026-09-28
Please find attached the revised plans.
Narrative
1. Omit the original foundation plan sheet A-1 and replace with the new structural plans attached.
2. A-2 adjusted the two center columns from 1'-4"sq. to 2'-0" sq.
3. A-3 adjusted the 2 center columns from 8x8 pt wood to 1'-4" sq. conc. cmu column at 2nd floor and 3rd is 8x8 pt wood column.
4. A-4 adjusted the 2nd and 3rd floor framing to match the pre-engineer truss layout.
5. A-5 adjusted the roof framing plan to match the pre-engineer truss layout
6. E-1 adjusted the two center columns from 1'-4"sq. to 2'-0" sq. at first floor and 2 center columns from 8x8 pt wood to 1'-4" sq. conc. cmu column at 2nd floor
3. E-2 adjusted the 2 center columns to be 8x8 pt wood columns
Professionals on this permit Green Street Builders LLC (Licensed Professional)
2026-09-15
SR#26-00033284-"Yard is very overgrown and there is an accumulation of construction materials strewn everywhere in the yard, very junked up"
2026-09-15
19-49 Accumulations; 19-50 Overgrowth