2026-07-30
SCHNEIDER RESIDENCE - MISC (RES) -- IN KIND DRIVEWAY REPLACEMENT. NO CHANGE TO ORIGINAL FOOTPRINT.
Reported project value $11,453
Scope Code Residential Site Work
Application Square Footage 1108
Professionals on this permit Arbor Hills Construction (General contractor)
2026-07-07
655 Woodward way Remove / Replace driveway -- Current driveway is to be removed. Any roots under the existing driveway are to be removed. Subbase is to be inspected and if necessary repaired. New driveway will be be poured. Driveway will be 4 to 5in thick 4000 psi concrete with a #3 rebar. There will be no disturbance of current city curb and gutter. All water runoff will remain as it is now. Water is running to the gutter at the street.