2026-07-20
2026-005792
· Building/Residential/New Home/NA · ISSUED
SINGLE FAMILY STICK BUILT NEW SINGLE FAMILY RESIDENTIAL CONSTRUCTION
ZONED R-20/OSC, OK FOR NEW HOME WITHIN REQUIRED SETBACKS. LOTS WITH REAR PROPERTY LINES ALONG R-30 LOTS OR OLD DALLAS RD TO HAVE REAR SETBACKS OF 45FT. PROPER LANDSCAPING PER STIPULATIONS IN Z-9 OF 2022. HOMES TO BE A MINIMUM OF 2,400SF. 20FT SETBACK OF GARAGES FROM THE RIGHT-OF-WAY. DISTRICT COMMISSIONER TO HAVE THE AUTHORITY TO APPROVE CERTAIN MINOR MODIFICATIONS TO THE SITE PLAN, EXCEPT FOR CHANGES THAT REDUCE BUFFERS OR ALTER STRUCTURES ALONG PROPERTY LINES OF MORE RESTRICTIVE ZONINGS. PER Z-9 OF 2022. MAX IMPERV 7000 SQUARE FEET. HOME LAYOUT APPROVED BY JPP TO SATISFY STIPULATION 4 OF REZONING CASE Z-9 OF 2022.
The minimum floor elevation shall be at least 3.0 feet above the local 100 yr headwater pool elevation(s), unless pooling runoff will bypass the building with 1.0 foot of freeboard protection. Builder shall provide an adequate swale between/behind the houses to accommodate any overflows from the inlet. Individual site plans must be prepared for these lots to demonstrate how overflows from inlets at these lots will bypass the buildings and how runoff will be directed in accordance with the approved hydrology study. The homes first floor/garage elevation must be 1’ above the top of curb.
This lot requires trees to be planted in accordance with the approved Tree Protection and Replacement Plan for this subdivision. Tree planting locations, planting methods and plant material (size, species, and quality) must be in accordance with the approved plan. This must be verified prior to the issuance of the Certificate of Occupancy. The homebuilder must us the online accela citizens access portal to request and arborist inspection at least 3 days prior to the date that the inspection is needed.
This lot has a requirement to plant four shade trees (not ornamentals or pines). At least two trees must be planted in the front yard with at least one tree to be three inches caliper planted in the front setback area. All other trees must be a minimum of two inches caliper. These trees must be planted when the house is near completion. The installation of these trees must be verified prior to the issuance of the Certificate of Occupancy. The homebuilder must use the online Accela Citizens Access Portal request an Arborist inspection at least 3 days prior to the date that the inspection is needed.