← Back to leads
Permit history › Atlanta, GA › Peachtree Rd NW › 2300 Peachtree Rd NW, Atlanta 30309

Property History

2300 Peachtree Rd NW, Atlanta 30309

5 permits have been filed at 2300 Peachtree Rd NW, Atlanta 30309 since July 2026, covering signage, plumbing and tree work. The most recent was filed October 22, 2026 (status: PENDING). Reported project value on file totals $230,000.

Property

JurisdictionAtlanta, GA
Parcel IDNot on file
Permits on file5
Reported project value (all permits)$230,000
First filedJuly 28, 2026
Most recent filingOctober 22, 2026

Contractors and professionals on record

General contractorMRP Design Group Inc. · 1 permit here
General contractorSignal Signs · 1 permit here
General contractorSLAM MECHANICAL LLC · 1 permit here
General contractorTHE DAVEY TREE EXPERT COMPANY · 1 permit here

Permit History (5 permits, all statuses)

2026-10-22
BS-202600925 · Wall Signs · PENDING
Rosa Clara (Suite C110) -- Halo-illuminated Reverse Channel Letters installed on Building
SqFt 6.04
Height of Sign 10"
Professionals on this permit Signal Signs (General contractor)
2026-10-20
BP-202604250 · Commercial - Plumbing · ISSUED
MAHJ STUDIOS / SUITE C101 -- Provide all labor and necessary materials to complete the plumbing rough-in in accordance with the provided construction plans and applicable local plumbing codes. Work will include saw-cutting and removal of the existing concrete slab as necessary to excavate trenches for installation of the new underground sanitary drainage system. Plumbing rough-in will include: • Two (2) restroom areas, including required sanitary drainage, domestic water piping, and vent piping for all fixtures shown on the plans. • Kitchen plumbing serving the three-compartment sink, mop/service sink, hand sink, floor drains, floor sinks, and other plumbing fixtures indicated on the plans. • Installation of sanitary waste and vent piping for all fixtures. • Installation of hot and cold domestic water piping to each applicable fixture location. • Installation of required cleanouts in accordance with the plans and local plumbing code. • Kitchen waste piping will be routed through the specified grease interceptor/trap before connecting to the sanitary sewer system. • Restroom sanitary piping will connect to the building sanitary sewer system as indicated on the plans. • Proper sizing, grading, support, and venting of all new plumbing systems in accordance with applicable code requirements. • Testing and inspection of the new plumbing systems as required by the Authority Having Jurisdiction. • Plumbing permit for the work included within this scope. All plumbing work will be performed in accordance with the provided plans, manufacturer’s requirements, and applicable local plumbing codes. Provide all labor, equipment, and necessary materials to excavate and install a new sanitary sewer line to serve the building in accordance with applicable plumbing codes and local requirements. Work will include mobilizing a large excavator to excavate the required trench and install the new underground sewer piping. The sewer installation will include: • Excavation for the new sanitary sewer line using a large excavator. • Installation of new four-inch PVC sanitary sewer piping from the building to the existing cleanout location. • Connection to the existing cleanout and transition to six-inch sanitary sewer piping from that point forward. • Excavation and installation of the six-inch sewer line to the existing manhole. • Creation of a new penetration through the existing manhole. • Installation of the new sewer line into the manhole. • Proper sealing and waterproofing of the new manhole penetration. • Installation of required fittings, connections, bedding, and pipe supports as necessary for a complete sewer installation. • Proper grading and alignment of the new sewer line to maintain required flow. • Testing and inspection of the new sewer line as required by the Authority Having Jurisdiction. • Permit pricing for the work included within this scope. All work will be performed in accordance with applicable plumbing codes, local requirements, and standard industry practices.
Scope Code C3 Business
Building Type Existing
Professionals on this permit SLAM MECHANICAL LLC (General contractor)
Status changes we observed PENDING (October 20, 2026) → ISSUED (October 21, 2026)
2026-10-01
BA-202605104 · Arborist Dead Dying Hazardous Tree · PENDING
No description on file.
Professionals on this permit THE DAVEY TREE EXPERT COMPANY (General contractor)
2026-08-12
ORR-202601813 · Open Record Request · CLOSED
PLANS ON LIST
Certificate of Occupancy No
Status changes we observed PENDING (August 12, 2026) → CLOSED (August 13, 2026)
2026-07-28
BB-202606570 · Commercial Conversion · PENDING
MAHJ STUDIOS / SUITE C101 -- Interior alteration of an existing office space for a new membership based Mahjong Studio. Scope of work to include selective demolition, new ADA restrooms, ceilings, finishes with associated MEP. Tenant is requesting a certificate of occupancy.
Reported project value $230,000
Application Square Footage 3523
Professionals on this permit MRP Design Group Inc. (General contractor)

About this data

These are public permit records for Atlanta, GA, collected from the official permit portal. Records can be incomplete or out of date, so check with the issuing agency before relying on them. Stamptd is not affiliated with any government agency.