2026-10-25
3190993
· Structural Building Permit · PENDING
Termite Damage 798 -- 3RD FLOOR : The damage is in the exterior wall. The master tub will have to be removed and installed again. There is apossibility the tub will crack and bust it has been cemented in place. If the tub is damaged the tub will have to be replaced as asupplement. The walk studs go behind the tub and the exterior wall. This is the reason for the removal of the tub. The damagemembers and the drywall and insulation will be replaced as normal. The Tile around the tub will be a loss. zit will have to beremoved and new tile re installed. The ceiling repair will be a patch and paint. Once the repairs are completed, the area willbe finished back as original with a new selected tile surrounds.4TH FLOOR: The damage is all around the exterior door. This includes the top, sides and the hardwood floors. We willreplace the damaged studs header, drywall, insulation, etc. The Hardwood will be repaired and re finished by sanding andrefinishing. Once the repairs have been completed, we will finish the area back as original.On side note as all know, Homeowners and the HOA, and board. We give no guarantee as to the condition or how the stuccofinish will fair or react to the interior repairs.
Reported project value $63,290
Professionals on this permit Thomas Construction, Inc (Contractor)