2026-07-16
Raising Canes Conversion -- Rough in under slab plumbing,
Wall rough and overhead plumbing hookup of kitchen equipment and bathroom fixtures, run new gas lines and hook up gas equipment.2 gas water heaters
3 gas RTU's
4 gas double Fryers
2 toilets
2 lavatories
1 4 compartment sink
2 hand sinks
1 prep sink
1 pot filler sink
2026-07-15
Sign 1, Install 1 double-sided, internally illuminated pylon sign -- Sign 1, Install 1 double-sided, internally illuminated pylon sign
2026-07-13
Sign 2 A "RC" wall sign -- Sign 2 A- install one "RC" wall sign on
2026-07-13
pylon sign head replacement -- Replace the head of the existing Krystal pylon sign with a new Raising Canes head
2026-07-13
Sign 7- Install one set of ONE LOVE letters -- Sign 7- Install one set of ONE LOVE letters on southwest elevation
2026-07-13
Raising Canes wall sign 2B -- Install one "RC" sign on south east elevation Sign 2B
2026-07-13
Sign 3- Install one "RC" sign -- Sign 3- Install one "RC" sign on south west main elevation
2026-07-09
Raising Cane's -- Electrical work
2026-07-09
RAISING CANES (C1298) -- 2 RTU'S - HOODS, KEF FANS, NAKE UP AIR UNIT - 1 EF1
2026-07-08
BB-202509301 -- Electrical installations for new Raising Cane's restaurant