2026-09-14
DRAMA HOTPOT (Suite 100) -- Interior alteration and cosmetic renovation to existing Suite. Work includes replacement of interior furniture (booths, tables, and seating), interior painting, and installation of new business signage. No structural modifications, load-bearing wall alterations, plumbing, or major electrical changes.
Have you received Zoning Approval No
Status changes we observed OTHER (September 14, 2026) → CLOSED (September 15, 2026)
2026-09-03
Howell Mill Project -- * Clean and prepare the existing roof surface for the installation of a new roofing system.
• Mechanically Attach 1 layer of ½” HD ISO Cover Board over existing TPO System (Section 1)
• Mechanically Attach .60-mil TPO roof membrane using approved GAF Fasteners (Section 1)
• Fully Adhere .60 Mil TPO over the existing TPO Membrane using GAF Quick Spray Adhesive per GAF Specs (Section 2)
• Flash all roof penetrations in accordance with manufacturer specifications to ensure a watertight system.
• Fully adhere TPO membrane over all parapet walls and prepare for coping installation.
• Install 24 GA Pre-finished shop fabricated ES-1 certified coping, counter flashing, and other metal accessory per plans.
• Provide a 20-Year NDL Diamond Pledge Warranty backed by GAF.
2026-09-03
No description on file.
2026-08-07
887 Howell Mill Rd -- Traffic signal
Total Square Footage 0
Professionals on this permit LUMIN8 TRANSPORTATION TECH LLC (General contractor)
Status changes we observed PENDING (August 7, 2026) → ISSUED (August 12, 2026)