2026-10-09
1.Revised product data showing acceptable manufacturers with UL listed products to be
used for this project.
2.Revised drawing FP1 which reflects changes to the layout to help minimize the
amount of heads per outlet as well as clarification on symbol.
3.This area has been RFI’ed and changes to the drawing (see FP1) have been implemented. This
will be coordinated closely in the field and if any other changes need to be made it will be
handled as an “AS-BUILT”
4. Change to FP1 has been made to reflect the added sprinkler head.
5. Adjustments to the sprinkler layout on FP1 to accommodate aesthetics as much as possible
while still being in compliance with NFPA13 standards.
6.Changes have been made to these areas as reflected on FP1 to ensure proper coverage around
structural columns.
Professionals on this permit PYE-BARKER FIRE & SAFETY, LLC DBA COX FIRE PROTECTION (Licensed Professional)
2026-09-21
PMI Tampa 7th FL
Pye-Barker Fire Safety LLC (PBFS) will demo cable back to closest junction box and replace fire alarm
notification and smoke detection devices in accordance with Level 7 fire alarm drawings E3.107 for the office remodel, dated 6/5/26
Professionals on this permit Pye-Barker Fire & Safety, LLC (Licensed Professional)
2026-09-16
No description on file.
2026-09-09
add/relocate 260 fire sprinkler heads in conjunction with the GC permit
Professionals on this permit PYE-BARKER FIRE & SAFETY, LLC DBA COX FIRE PROTECTION (Licensed Professional)
2026-09-08
BLD-26-0527886
· Commercial Building Alterations (Renovations) · PENDING
No description on file.
Status changes we observed IN_PROGRESS (September 8, 2026) → PENDING (September 12, 2026)