2026-07-17
Ashley Collegetown Apts BLDG 4-HVAC Upgrade -- Remove and replace 28 each, 24,000 BTU, 2-ton HVAC system units, reuse existing duct, refrigerant lines, & condensation drain. System to be SEER-2 electric heat pump, and A2L Refrigerant, new thermostats are included. Install new bath fans and dampers at existing location. Clean existing duct work and dryer duct.
Scope Code M1 Multi-Family Apartments
Building Type Existing
Professionals on this permit BARS (General contractor)
Status changes we observed PENDING (July 18, 2026) → ISSUED (July 20, 2026)
2026-07-16
Ashley Collegetown Apts BLDG 4-HVAC Upgrade -- Remove and replace 28 each, 24,000 BTU, 2-ton HVAC system units, reuse existing duct, refrigerant lines, & condensation drain. System to be SEER-2 electric heat pump, and A2L Refrigerant, new thermostats are included. Install new bath fans and dampers at existing location. Clean existing duct work and dryer duct.