2026-03-19
Upgrade existing electrical service to a 200-amp, 120/240-volt single-phase system. Scope of work includes removal of the existing service equipment and installation of a new 200-amp meter base, main service panel, service entrance conductors, grounding and bonding system, and associated service disconnect. All work will be performed in accordance with the current National Electrical Code (NEC) and local authority requirements. Utility coordination, required inspections, and system testing will be completed to ensure safe and reliable operation.
Reported project value $6,000