2026-10-08
Adar Developers, LLC- ADDITION (RES) -- Install new drywall throughout the home, tape and finish. Install new electrical receptacles and wall switches throughout home. Install new LVP flooring throughout home. Install new floor molding and quarter round. Install window and door trim around all doors and windows. Install 8 interior doors. Renovate three Bathrooms. Prep. and paint home interior. Extend/enlarge bedroom #2 closet. Install new Ceiling Fans in Room #1, Room #2, Bedroom #1, Bedroom #2 and Laundry room. Install new Kitchen Cabinets and Appliances. Repair the existing Fireplace and Exterior Walls. Build a new 5 by 6 rain porch. Touch-up exterior Paint.
Reported project value $65,000
Scope Code R1 Single Family Residence
Application Square Footage 1752
Professionals on this permit HOME WORKS PERFECTION, LLC (General contractor)
2026-10-06
1481 Venetial home Repair -- Install new drywall throughout the home, tape and finish. Install new electrical receptacles and wall switches throughout home. Install new LVP flooring throughout home. Install new floor molding and quarter round. Install window and door trim around all doors and windows. Install 8 interior doors. Renovate three Bathrooms. Prep. and paint home interior. Extend/enlarge bedroom #2 closet. Install new Ceiling Fans in Room #1, Room #2, Bedroom #1, Bedroom #2 and Laundry room. Install new Kitchen Cabinets and Appliances. Repair the existing Fireplace and Exterior Walls. Build a new 5 by 6 rain porch. Touch-up exterior Paint.
Reported project value $65,000
Scope Code R1 Single Family Residence
Application Square Footage 1752
2026-10-05
1481 Venetial home Repair -- Install new drywall throughout the home, tape and finish. Install new electrical receptacles and wall switches throughout home. Install new LVP flooring throughout home. Install new floor molding and quarter round. Install window and door trim around all doors and windows. Install 8 interior doors. Renovate three Bathrooms. Prep. and paint home interior. Extend/enlarge bedroom #2 closet. Install new Ceiling Fans in Room #1, Room #2, Bedroom #1, Bedroom #2 and Laundry room. Install new Kitchen Cabinets and Appliances. Repair the existing Fireplace and Exterior Walls. Build a new 5 by 6 rain porch. Touch-up exterior Paint.
2026-09-30
No description on file.
2026-09-18
1481 Venetial home Addition/Repair (RES) -- Install new drywall throughout the home,tape and finish. Install new electrical receptacles and wall switches throughout home. Install new LVP flooring throughout home. Install new floor molding and quarter round. Install window and door trim around all doors and windows. Install 8 interior doors. Renovate three Bathrooms. Prep. and paint home interior. Extend/enlarge bedroom #2 closet. Install new Ceiling Fans in Room #1, Room #2, Bedroom #1, Bedroom #2 and Laundry room. Install new Kitchen Cabinets and Appliances. Repair the existing Fireplace and Exterior Walls. Build a new 5 by 6 rain porch. Touch-up exterior Paint.
Reported project value $65,000
Scope Code R1 Single Family Residence
Application Square Footage 1752
2026-09-14
1481 Venetial home Repair (RES) -- Scope of Work
Exterior Work
? Replace one cracked window on the exterior of the home.
? Construct a new 5×6 rain porch at the front of the house, including framing, decking,
posts, and roofing.
? Install shingles on the new porch roof to match existing shingles on the home.
? Pressure wash the exterior of the home, roof and driveway.
? Retouch exterior paint
? Patch holes from plywood screws.
? Perform a full gutter cleaning.
Interior Work
Room 1
? Restore the existing fireplace to functional and aesthetic condition.
? Install new window trims.
? Install new sheetrock on all walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls, trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
Bedroom 1
? Install new trims on all windows.
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls, trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
Bathroom 1
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls, trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
? Install Durock in bath/shower area.
? Install new 24×12 wall tiles with built?in niche.
? Install new vanity with water lines and faucet.
? Install new bathroom exhaust fan.
Bedroom 2
? Install new trims on all windows.
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls,trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
? Extend existing closet to increase storage space.
Bathroom 2
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls,trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
? Install Durock in bath/shower area.
? Install new 24×12 wall tiles with built?in niche.
? Install new vanity with water lines and faucet.
? Install new bathroom exhaust fan.
Hallway
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls,trims and doors with hardware
? Install new LVP flooring.
? Install new light fixture.
? Install new panel switches and outlets.
Laundry Room
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new laundry door
? Prep and paint the walls,trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
? Install new outlet box for washer and dryer connections
Reported project value $65,000
Scope Code R1 Single Family Residence
Application Square Footage 1752
2026-09-13
1481 Venetial home Repair -- Scope of Work
Exterior Work
? Replace one cracked window on the exterior of the home.
? Construct a new 5×6 rain porch at the front of the house, including framing, decking,
posts, and roofing.
? Install shingles on the new porch roof to match existing shingles on the home.
? Pressure wash the exterior of the home, roof and driveway.
? Retouch exterior paint
? Patch holes from plywood screws.
? Perform a full gutter cleaning.
Interior Work
Room 1
? Restore the existing fireplace to functional and aesthetic condition.
? Install new window trims.
? Install new sheetrock on all walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls, trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
Bedroom 1
? Install new trims on all windows.
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls, trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
Bathroom 1
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls, trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
? Install Durock in bath/shower area.
? Install new 24×12 wall tiles with built?in niche.
? Install new vanity with water lines and faucet.
? Install new bathroom exhaust fan.
Bedroom 2
? Install new trims on all windows.
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls,trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
? Extend existing closet to increase storage space.
Bathroom 2
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls,trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
? Install Durock in bath/shower area.
? Install new 24×12 wall tiles with built?in niche.
? Install new vanity with water lines and faucet.
? Install new bathroom exhaust fan.
Hallway
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new 6 panel doors
? Prep and paint the walls,trims and doors with hardware
? Install new LVP flooring.
? Install new light fixture.
? Install new panel switches and outlets.
Laundry Room
? Install new sheetrock on walls and ceilings.
? Perform full tape, bed, and texture.
? Install new floor moldings and quarter rounds.
? Install new laundry door
? Prep and paint the walls,trims and doors with hardware
? Install new LVP flooring.
? Install new ceiling fan.
? Install new panel switches and outlets.
? Install new outlet box for washer and dryer connections
2026-09-11
Property Maintenance -- Overgrowth
Status changes we observed IN_PROGRESS (September 11, 2026) → OTHER (September 11, 2026)