2026-10-20
The proposal illustrated on Sheets E101A, E601A, and E602A would route new generator-start conductors
from the fire pump controller to existing ATS-B and connect to the existing generator-start circuit. The
drawings describe two-hour protection for the new conductors routed through the building and include a
proposed sequence of operation intended to demonstrate that the fire pump controller and ATS-B can
independently initiate generator operation.
Re: Building Official Decision – CBO-26-0000067 – TIA Long-Term Parking Garage – 4000 George J Bean Pkwy
- Fire Pump Generator Start Signal AMMR
Professionals on this permit International Fire Protection Inc. (Licensed Professional)
2026-09-15
CBO-26-0000067
· Alternative Methods and Materials Request or Code Interpretation · PENDING
Seeking approval for alternate means to connect fire pump control panel start signal to generator.