2026-09-04
Daniel Trzos - Battery -- (1) PW3 unit to be mounted to the left of the MSP on the exterior wall; all other equipment to be mounted to the right of the MSP on the exterior wall in the available space;
200/200 gateway 3 to be fed by the exterior MSP with 4/0 al; existing wires from interior panel to be extended to connect/feed from gateway;
battery breaker to land in the gateway;
Total Square Footage 1
Professionals on this permit ABEV POWER SOLUTIONS (General contractor)
Status changes we observed PENDING (September 4, 2026) → ISSUED (September 8, 2026)