2026-08-10
Gas Repipe- Per fixture -- This estimate is for running a new gas line from the gas meter and tying into the existing system. We will run the gas line down the wall behind the pool pump system and tie onto the pool heater. All gas piping will be properly strapped and secured. We will perform a pressure test on the gas line after installation and install the proper regulator required for the system. All exposed painted piping will be clear coated to help prevent rust and corrosion.
Building Type Existing
Professionals on this permit SLAM MECHANICAL LLC (General contractor)
Status changes we observed PENDING (August 10, 2026) → ISSUED (August 12, 2026)
2026-08-07
Gas Repipe- Per fixture -- This estimate is for running a new gas line from the gas meter and tying into the existing system. We will run the gas line down the wall behind the pool pump system and tie onto the pool heater. All gas piping will be properly strapped and secured. We will perform a pressure test on the gas line after installation and install the proper regulator required for the system. All exposed painted piping will be clear coated to help prevent rust and corrosion.
2026-08-07
Gas Repipe- Per fixture -- This estimate is for running a new gas line from the gas meter and tying into the existing system. We will run the gas line down the wall behind the pool pump system and tie onto the pool heater. All gas piping will be properly strapped and secured. We will perform a pressure test on the gas line after installation and install the proper regulator required for the system. All exposed painted piping will be clear coated to help prevent rust and corrosion.
Scope Code R1 Single Family Residence
Building Type Existing
Professionals on this permit SLAM MECHANICAL LLC (General contractor)